Santa Clara Valley Medical Center
The Santa Clara Valley Medical Center’s major overhaul was a $966 million construction project, which retrofited the hospital and medical buildings on the main campus at 551 S. Bascom Ave. in San Jose. The second phase, which costed an over $400million, included the construction of a 140-bed building. Olson Steel provided the metal stairs, stair railings and various other miscellaneous metal requirements.